AIR CONDITIONING UNIT > INSPECTION

for Preparation Click here



1. INSPECT MAX HOT SWITCH (w/ PTC Heater)


    E112160E01
  1. Measure the resistance of the switch.
    Standard resistance: 
    Tester Connection
    Switch Condition
    Specified Condition
    1 - 2
    ON
    Below 1 Ω
    1 - 2
    OFF
    10 kΩ or higher
    If the result is not as specified, replace the A/C unit.