IGNITION COIL > INSTALLATION

for Preparation Click here



1. INSTALL IGNITION COIL ASSEMBLY


    B012294E01
  1. Install the ignition coil with the bolt.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

  1. Connect the connector.



2. INSTALL AIR CLEANER ASSEMBLY

Torque:
8.0 N*m{ 82 kgf*cm , 71 in.*lbf }



3. INSTALL V-BANK COVER

Torque:
7.5 N*m{ 76 kgf*cm , 66 in.*lbf }



4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL


5. PERFORM INITIALIZATION
  1. Perform initialization (Click here).

    CAUTION:
    Certain systems need to be initialized after disconnecting the cable from the negative (-) battery terminal.