VACUUM REGULATING VALVE > INSTALLATION |
| 1. INSTALL VACUUM SWITCHING VALVE (for EGR CUT) |
![]() |
Install the valve with the bolt.
| 2. INSTALL VACUUM SWITCHING VALVE BRACKET |
![]() |
Install the bracket with the 2 bolts.
Connect the vacuum hoses to the 3 locations.
Connect the 2 connectors.
| 3. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY |
![]() |
Install the cover with the 3 bolts and 2 nuts.
| 4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
| 5. PERFORM INITIALIZATION |
Perform initialization (Click here).