THERMOSTAT > INSTALLATION |
| 1. INSTALL THERMOSTAT |
![]() |
Install a new gasket to the thermostat.
Insert the thermostat into the cylinder block with the jiggle valve facing straight upward.
| 2. INSTALL WATER INLET |
![]() |
Install the inlet with the 3 bolts.
| 3. INSTALL NO. 1 AUTOMATIC TRANSMISSION OIL COOLER TUBE CLAMP (for Automatic Transmission) |
![]() |
Connect the clamp to the inlet with the bolt.
| 4. INSTALL COMPRESSOR INLET ELBOW |
![]() |
Install a new gasket and inlet elbow with the 2 nuts.
Connect the ventilation pipe to the cylinder head cover.
Move the clamp to the joint pipe of the hose.
Install the ventilation pipe with the bolt.
Connect the 2 connectors to the turbocharger.
Install the harness clamp's clip to the inlet elbow.
| 5. CONNECT RADIATOR HOSE INLET |
Connect the hose to the water inlet.
| 6. INSTALL CHARGE AIR COOLER ASSEMBLY |
Install the charge air cooler (Click here).
| 7. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY |
![]() |
Install the cover with the 3 bolts and 2 nuts.
| 8. INSTALL AIR CLEANER ASSEMBLY |
![]() |
Connect the air cleaner hose.
Install the cleaner with the 2 bolts.
Tighten the hose clamp of the compressor inlet elbow.
Connect the MAF meter connector and install the clamp.
| 9. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
| 10. ADD ENGINE COOLANT |
Tighten the radiator drain cock plug by hand.
Tighten the cylinder block drain cock plug.
![]() |
Fill the radiator with TOYOTA Super Long Life Coolant (SLLC) to the reservoir tank's B line.
| Item | Specified Condition |
| A/T | 11.1 liters (11.7 US qts, 9.8 lmp. qts) |
| M/T | 9.8 liters (10.4 US qts, 8.6 lmp. qts) |
Press the inlet and outlet radiator hoses several times by hand, and then check the level of the coolant.
If the coolant level drops below the B line, add TOYOTA SLLC to the B line.
Install the radiator reservoir cap.
![]() |
Using a wrench, install the vent plug.
Bleed air from the cooling system.
Warm up the engine until the thermostat opens. While the thermostat is open, circulate the coolant for several minutes.
Maintain the engine speed at 2,000 to 2,500 rpm.
Press the inlet and outlet radiator hoses several times by hand to bleed air.
Stop the engine and wait until the coolant cools down to ambient temperature.
![]() |
After the coolant cools down, check that the coolant level is at the F line.
If the coolant level is below the F line, add TOYOTA SLLC to the F line.
| 11. CHECK FOR ENGINE COOLANT LEAKS |
Check for the engine coolant leaks (Click here).
| 12. INSTALL NO. 1 ENGINE UNDER COVER |
Install the cover with the 4 bolts.
| 13. PERFORM INITIALIZATION |
Perform initialization (Click here).