VACUUM SWITCHING VALVE (for Unleaded Gasoline Specification Vehicle) > INSTALLATION

for Preparation Click here



1. INSTALL VACUUM SWITCHING VALVE (for EVAP)


    A112077
  1. Install the VSV with the bolt.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

  1. Connect the 2 hoses to the VSV.



2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL


3. PERFORM INITIALIZATION
  1. Perform initialization (Click here).

    CAUTION:
    Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.