DIESEL THROTTLE BODY > INSTALLATION |
| 1. INSTALL DIESEL THROTTLE BODY ASSEMBLY |
![]() |
Install a new gasket and the throttle body with the 2 bolts and 2 nuts.
![]() |
Connect the 2 connectors.
| 2. INSTALL NO. 2 AIR CLEANER PIPE SUB-ASSEMBLY |
![]() |
Connect the pipe (with the 2 air hoses) and install the bolt.
Tighten the 2 clamps.
Connect the vacuum hose to the gas filter.
Connect the manifold absolute pressure sensor connector.
| 3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
| 4. PERFORM INITIALIZATION |
Perform initialization (Click here).