PRE-HEATING SYSTEM > ON-VEHICLE INSPECTION |
| 1. CHECK ILLUMINATION DURATION OF GLOW INDICATOR LIGHT |
Check the light illumination duration.

Turn the ignition switch ON, and then measure the light illumination duration.
Turn the ignition switch OFF.
| 2. CHECK PRE-HEATING |
Inspect the pre-heating time.

Turn the ignition switch ON. Measure how long it takes for battery voltage to be applied to the glow plugs.
| Engine Coolant Temperature | pre-heating Time |
| 40 °C (104 °F) or higher | 1 second |
| Less than 40 °C (104 °F) | See graph (maximum: 15 seconds) |
Turn the ignition switch OFF.
Turn the ignition switch to START. Check that battery voltage is applied to the glow plugs.
While cranking the engine, measure how long it takes for battery voltage to be applied to the glow plugs.
| Engine Coolant Temperature | pre-heating Time |
| 40 °C (104 °F) or higher | 1 second |
| Less than 40 °C (104 °F) | See graph (maximum: 15 seconds) |
| 3. CHECK AFTERGLOW TIME |
Check the afterglow time.

After the engine starts, measure how long it takes for battery voltage to be applied to terminals E5-15 (GREL) and E7-7 (E1) of the ECM.
| Tester Connection | Specified Condition |
| E5-15 (GREL) - E7-7 (E1) | See graph |