LOW PITCHED HORN > INSTALLATION

for Preparation Click here



1. INSTALL LOW PITCHED HORN ASSEMBLY


B112706E01
  1. Place the stay onto the baffle part of the radiator support upper, and then install the horn with the bolt.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

    NOTICE:
    Do not overlap the horn and the protruding part of the radiator support.

  1. Connect the connector.