VALVE BODY > REASSEMBLY

for Preparation Click here



1. INSTALL SHIFT SOLENOID VALVE S2


D027988E01
  1. Install the O-ring to the shift solenoid valve S2.

  1. Install the bolt and shift solenoid valve S2.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



2. INSTALL SHIFT SOLENOID VALVE S1


D027987E01
  1. Install the O-ring to the shift solenoid valve S1.

  1. Install the bolt and shift solenoid valve S1.

    Torque:
    6.4 N*m{ 65 kgf*cm , 57 in.*lbf }



3. INSTALL SHIFT SOLENOID VALVE SL1


D027986E01
  1. Install the shift solenoid valve SL1.



4. INSTALL SHIFT SOLENOID VALVE SLT


D027985E01
  1. Install the shift solenoid valve SLT.

  1. Install the bolt, 2 straight pins and solenoid lock plate.

    Torque:
    6.4 N*m{ 65 kgf*cm , 57 in.*lbf }



5. INSTALL SHIFT SOLENOID VALVE SL2


D027984E01
  1. Install the shift solenoid valve SL2.



6. INSTALL SHIFT SOLENOID VALVE SLU


D027983E01
  1. Install the shift solenoid valve SLU.

  1. Install the bolt, 2 straight pins and solenoid lock plate.

    Torque:
    6.4 N*m{ 65 kgf*cm , 57 in.*lbf }



7. INSTALL SHIFT SOLENOID VALVE SR


D027982E01
  1. Install the 2 bolts and shift solenoid valve SR.

    Torque:
    6.4 N*m{ 65 kgf*cm , 57 in.*lbf }



8. INSTALL TRANSMISSION VALVE BODY ASSEMBLY


D012707E01
  1. Align the groove of the manual valve with the pin of the lever.



    D012705E02
  1. Install the 19 bolts.

    Torque:
    11 N*m{ 110 kgf*cm , 8 ft.*lbf }

    HINT:
    Bolt length:
    25 mm (0.98 in.) for bolt A
    36 mm (1.42 in.) for bolt B