GENERATOR > INSTALLATION |
| 1. INSTALL GENERATOR ASSEMBLY |
![]() |
Install the generator with the 2 bolts.
Install the generator wire with the bolt and nut.
Connect the connector.
| 2. INSTALL DRIVE BELT |
![]() |
Install the drive belt to the pulleys except the drive belt tensioner pulley.
Use the hexagon-shaped part indicated by the arrow in the illustration to move the tensioner pulley downward and then install the drive belt to the tensioner pulley.
![]() |
After a new belt has been installed, check that the tensioner indicator mark is within range A shown in the illustration.
| 3. INSTALL INTAKE AIR CONNECTOR AND AIR CLEANER ASSEMBLY |
![]() |
Install the air cleaner and intake air connector assembly with the 4 bolts, and tighten the hose clamp.
Connect the MAF meter connector and wire harness clamps.
Connect the No. 2 ventilation hose.
Connect the vacuum hose.
| 4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
| 5. PERFORM INITIALIZATION |
Perform initialization (Click here).