GENERATOR > INSTALLATION

for Preparation Click here



1. INSTALL GENERATOR ASSEMBLY


    A099681E03
  1. Install the generator with the 2 bolts.

    Torque:
    43 N*m{ 438 kgf*cm , 32 ft.*lbf }

  1. Install the generator wire with the bolt and nut.

    Torque:
    9.8 N*m{ 100 kgf*cm , 87 ft.*lbf }

  1. Connect the connector.



2. INSTALL DRIVE BELT


    A097752E02
  1. Install the drive belt to the pulleys except the drive belt tensioner pulley.

  1. Use the hexagon-shaped part indicated by the arrow in the illustration to move the tensioner pulley downward and then install the drive belt to the tensioner pulley.

    NOTICE:
    1. The backside of the drive belt should face the tensioner pulley.
    2. Check that the drive belt is properly set to each pulley.



    G038479E01
  1. After a new belt has been installed, check that the tensioner indicator mark is within range A shown in the illustration.



3. INSTALL INTAKE AIR CONNECTOR AND AIR CLEANER ASSEMBLY


    A099871E01
  1. Install the air cleaner and intake air connector assembly with the 4 bolts, and tighten the hose clamp.

    Torque:
    14 N*m{ 143 kgf*cm , 10 ft.*lbf } for air cleaner
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf } for intake air connector
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf } for hose clamp

  1. Connect the MAF meter connector and wire harness clamps.

  1. Connect the No. 2 ventilation hose.

  1. Connect the vacuum hose.



4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL


5. PERFORM INITIALIZATION
  1. Perform initialization (Click here).

    NOTICE:
    Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.