STARTER > INSTALLATION

for Preparation Click here



1. INSTALL STARTER ASSEMBLY


    G039040E01
  1. Install the starter with the 2 bolts.

    Torque:
    37 N*m{ 377 kgf*cm , 27 ft.*lbf }

  1. Install the starter wire to terminal 30 with the nut.

    Torque:
    9.8 N*m{ 100 kgf*cm , 87 in.*lbf }

  1. Connect the starter connector.

  1. Install the clutch release cylinder (Click here).



2. INSTALL FRONT FENDER SEAL
  1. Install the fender seal with the 5 clips.



3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL


4. PERFORM INITIALIZATION
  1. Perform initialization (Click here).

    NOTICE:
    Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.