AIR CONDITIONING CONTROL ASSEMBLY > INSTALLATION

for Preparation Click here



1. INSTALL AIR CONDITIONING CONTROL ASSEMBLY


    E111653E01
  1. Attach the 2 claws to connect the air mix damper control cable.

  1. Attach the 2 claws to connect the heater control cable.



    E111654E01
  1. Connect the connector.

  1. Attach the 2 claws to connect the air inlet damper control cable.



    E110987E01
  1. Attach the 2 claws to connect the A/C control.



2. INSTALL INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY CENTER


B113049E01
  1. Connect all connectors.

  1. Attach the 6 claws and 4 clips to install the panel.

  1. Install the panel with the screw <C>.



3. INSTALL FRE/REC CONTROL KNOB


B111103E02
  1. Install the control knob.



4. INSTALL HEATER CONTROL KNOB


B088680E02
  1. Install the 3 control knobs.



5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL


6. PERFORM INITIALIZATION
  1. Perform initialization (Click here).

    NOTICE:
    Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.