BLOWER UNIT > INSTALLATION

for Preparation Click here



1. INSTALL BLOWER ASSEMBLY


    E111009
  1. Connect the blower unit to the A/C radiator.

  1. Install the blower assembly with the 3 bolts.

  1. Install the nut.

    Torque:
    9.8 N*m{ 100 kgf*cm , 7 ft.*lbf }



2. INSTALL INSTRUMENT PANEL REINFORCEMENT


  1. Install the instrument panel reinforcement with the 7 bolts.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }



    I045584



  1. Install the 3 bolts.

    Torque:
    9.8 N*m{ 100 kgf*cm , 7 ft.*lbf }



    I045583

  1. Connect the connectors.



  1. Attach the 12 clamps.


    I045582E01



    I045594E01
  1. Install the grommet to the vehicle body.



    I045581E01
  1. Connect the ground wires to the instrument panel reinforcement with the 2 bolts.



    E111655E01
  1. Connect the connector and wire harness.

  1. w/o PTC heater:
    Attach the 2 clamps.

  1. w/ PTC heater:
    Attach the 3 clamps.



    I045577E01
  1. Connect the connector and wire harness.

  1. Attach the 2 clamps.



3. INSTALL NO. 4 AIR DUCT


E110995E01
  1. Attach the 2 claws to install the duct.



4. INSTALL ECM
For 1TR-FE (Click here)
For 2TR-FE (Click here)
For 1GR-FE (Click here)
For 1KD-FTV (Click here)
For 2KD-FTV (Click here)


5. INSTALL NO. 1 INSTRUMENT PANEL BRACE SUB-ASSEMBLY


I045576E01
  1. Connect the connectors to install the instrument panel junction block.

  1. Attach the 2 clamps to install the brace.

  1. Install the brace with the 3 nuts and 2 bolts.



6. INSTALL STEERING COLUMN ASSEMBLY
  1. Install the steering column with the 3 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }



7. INSTALL NO. 3 HEATER TO REGISTER DUCT


I045575E01
  1. Attach the 4 claws to install the duct.



8. INSTALL NO. 1 HEATER TO REGISTER DUCT


I043959E01
  1. Attach the 3 claws to install the duct.



9. INSTALL NO. 2 HEATER TO REGISTER DUCT


I043958E01
  1. Install the clip and duct.



10. INSTALL INSTRUMENT PANEL SUB-ASSEMBLY LOWER
  1. Install the instrument panel sub-assembly lower (Click here).



11. INSTALL INSTRUMENT PANEL SUB-ASSEMBLY UPPER
  1. Install the instrument panel sub-assembly upper (Click here).



12. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL


13. PERFORM INITIALIZATION
  1. Perform initialization (Click here).

    NOTICE:
    Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.



14. CHECK SRS WARNING LIGHT
  1. Check the SRS warning light (Click here).