INPUT SHAFT > INSTALLATION |
| 1. INSTALL INPUT SHAFT FRONT BEARING |
![]() |
Using SST and a press, press in a new front bearing to the input shaft.
| 2. INSTALL FRONT BEARING SHAFT SNAP RING |
Select a snap ring that makes the clearance between the input shaft and front bearing within the specification.
| Mark | Thickness |
| A | 2.10 to 2.15 mm (0.0827 to 0.0846 in.) |
| B | 2.15 to 2.20 mm (0.0846 to 0.0866 in.) |
| C | 2.20 to 2.25 mm (0.0866 to 0.0886 in.) |
| D | 2.25 to 2.30 mm (0.0886 to 0.0906 in.) |
| E | 2.30 to 2.35 mm (0.0906 to 0.0925 in.) |
| F | 2.35 to 2.40 mm (0.0925 to 0.0945 in.) |
| G | 3.40 to 2.45 mm (0.0945 to 0.0965 in.) |
![]() |
Using a snap ring expander, install the snap ring.
| 3. INSTALL INPUT SHAFT BEARING |
![]() |
Apply gear oil to the input shaft bearing, and install it to the input shaft.
| 4. INSTALL NO. 2 SYNCHRONIZER RING |
![]() |
Apply gear oil to No. 2 synchronizer ring, and install it to the input shaft.