COUNTER GEAR AND REVERSE IDLER GEAR > INSTALLATION |
| 1. INSTALL COUNTER GEAR FRONT BEARING |
![]() |
Using SST and a press, press in a new front bearing to the counter gear.
![]() |
Select a snap ring that will allow minimum axial play.
| Mark | Thickness |
| 1 | 2.05 to 2.10 mm (0.0807 to 0.0827 in.) |
| 2 | 2.10 to 2.15 mm (0.0827 to 0.0847 in.) |
| 3 | 2.15 to 2.20 mm (0.0847 to 0.0866 in.) |
| 4 | 2.20 to 2.25 mm (0.0866 to 0.0886 in.) |
| 5 | 2.25 to 2.30 mm (0.0886 to 0.0906 in.) |
| 6 | 2.30 to 2.35 mm (0.0906 to 0.0925 in.) |
![]() |
Using a snap ring expander, install the snap ring.
| 2. INSTALL NO. 3 TRANSMISSION HUB SLEEVE |
![]() |
Coat the 5th gear with gear oil.
Install the No. 3 hub sleeve and 2 No. 3 synchromesh shifting keys to the 5th gear.
Install the key spring (C spring) and key spring (return spring) to the 5th gear.
![]() |
Using a snap ring expander, install the snap ring to the 5th gear.
| 3. INSTALL COUNTER 5TH GEAR BEARING |
![]() |
Coat the 5th gear bearing with gear oil, and install it to the 5th gear.
| 4. INSPECT COUNTER SHAFT 5TH GEAR RADIAL CLEARANCE |
![]() |
Install the 5th gear thrust washer lock ball, 5th gear thrust washer and counter shaft 5th gear to the counter gear.
Using a dial indicator, measure the 5th gear radial clearance.