PARK / NEUTRAL POSITION SWITCH > INSPECTION |
| 1. INSPECT PARK/NEUTRAL POSITION SWITCH |
![]() |
Measure the resistance of the PNP switch when the shift lever is moved to each position.
| Tester Connection | Shift Lever Position | Specified Condition |
| 4 (B) - 5 (L) | P or N | Below 1 Ω |
| 4 (B) - 5 (L) | Not on P or N | 10 kΩ or higher |
| 1 (RL) - 2 (RB) | R | Below 1 Ω |
| 1 (RL) - 2 (RB) | Not on R | 10 kΩ or higher |
| 2 (RB) - 7 (DL) | D | Below 1 Ω |
| 2 (RB) - 7 (DL) | Not on D | 10 kΩ or higher |
| 2 (RB) - 3 (2L) | 2 | Below 1 Ω |
| 2 (RB) - 3 (2L) | Not on 2 | 10 kΩ or higher |
| 2 (RB) - 8 (LL) | L | Below 1 Ω |
| 2 (RB) - 8 (LL) | Not on L | 10 kΩ or higher |