THROTTLE BODY > INSTALLATION |
| 1. INSTALL THROTTLE BODY |
Install a new gasket to the intake air surge tank.
Install the throttle motor connector.
| 2. REMOVE AIR CLEANER ASSEMBLY |
| 3. REMOVE NO. 2 VENTILATION HOSE |
| 4. REMOVE V-BANK COVER |
| 5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
| 6. ADD ENGINE COOLANT |
Tighten all the plugs and fill the radiator with TOYOTA Super Long Life Coolant (SLLC).
| Item | Specified Condition |
| A/T | 9.8 liters (10.4 US qts, 8.6 lmp. qts) |
| M/T | 8.5 liters (9.0 US qts, 7.5 lmp. qts) |
Press the inlet and outlet radiator hoses several times by hand, and then check the level of the coolant.
Install the radiator cap.
Bleed air from the cooling system.
Warm up the engine until the thermostat opens. While the thermostat is open, circulate the coolant for several minutes.
Maintain the engine speed at 2,000 to 2,500 rpm.
Press the inlet and outlet radiator hoses several times by hand to bleed air.
Stop the engine and wait until the coolant cools down to ambient temperature.
![]() |
Check the coolant level in the radiator reservoir.
If the coolant level is low, add SLLC to the reservoir F line.
| 7. CHECK FOR ENGINE COOLANT LEAKS |
Check for engine coolant leaks (Click here).
| 8. PERFORM INITIALIZATION |
Perform initialization (Click here).