MASS AIR FLOW METER > INSTALLATION

for Preparation Click here



1. INSTALL MASS AIR FLOW METER


A112042
  1. Install a new O-ring to the MAF meter.

  1. Install the MAF meter with the 2 screws.

  1. Connect the MAF meter connector.



2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL


3. PERFORM INITIALIZATION
  1. Perform initialization (Click here).

    NOTICE:
    Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.