WASTE GATE SOLENOID VALVE CHECK <4G1>



OPERATION CHECK



1.Connect a hand vacuum pump to the solenoid valve nipple A.
2.Using a jumper wire, connect between the solenoid valve terminal and battery terminal.
3.Connecting and disconnecting the jumper wire at the battery negative terminal to apply a negative pressure, check tightness.
Jumper wire
B nipple condition
Normal condition
Connected
Opened
Negative pressure leaks.
Closed
Negative pressure is held.
Disconnected
Opened
Negative pressure is held.

COIL RESISTANCE CHECK



Measure the resistance between solenoid valve terminals
Standard value: 29 - 35 Ω (at 20°C)