
|
1.Before inspection, set the vehicle to the pre-inspection condition. 2.Turn the ignition switch to "LOCK" (OFF) position. 3.Connect the M.U.T.-III to the diagnosis connector.
|

|
4.Disconnect the ventilation hose from the positive crankcase ventilation (PCV) valve, and then connect a vacuum gauge to the ventilation hose. Plug the positive crankcase ventilation (PCV) valve. 5.Start the engine and check that idle speed is within the standard valve. Standard value: 830 ± 100 r/min 6.Check the intake manifold vacuum. Limit: Minimum 60 kPa 7.Turn off the ignition switch. 8.Remove the vacuum gauge and then connect the ventilation hose to the positive crankcase ventilation (PCV) valve. 9.Remove the M.U.T.-III.
|