POWER STEERING PRESSURE (PSP) SWITCH INSPECTION [ZJ, Z6]
B3E014032230W01
-
Note
-
• Before performing the following inspection, make sure to follow the procedure as indicated in the troubleshooting flowchart. (See Troubleshooting Procedure.)
Continuity Inspection
1. Inspect the following items:
-
• Power steering fluid amount (See POWER STEERING FLUID INSPECTION.)
-
• Power steering-related inspection (See STEERING LOCATION INDEX.)
2. Disconnect the PSP switch connector.
3. Start the engine.
4. Verify that the continuity between PSP switch terminal A and body GND is as indicated in the table.
-
• If not as indicated in the table, replace the CPP switch. (See POWER STEERING OIL PUMP (ZJ, Z6) DISASSEMBLY/ASSEMBLY.)
-
• If the monitor item condition/specification (reference) is not within the specification, even though there is no malfunction, perform the "Circuit Open/Short Inspection".
Circuit Open/Short Inspection
1. Remove the PCM connector cover.
2. Disconnect the PCM connector. (See INTAKE-AIR SYSTEM REMOVAL/INSTALLATION [ZJ, Z6].)
3. Inspect the following wiring harness for open or short circuit (continuity check).
Open circuit
-
• If there is no continuity, there is an open circuit. Repair or replace the wiring harness.
-
- PSP switch terminal A and PCM terminal 2AC
Short circuit
-
• If there is continuity, there is a short circuit. Repair or replace the wiring harness.
-
- PSP switch terminal A and body GND