Fuel and Emissions Systems

System Descriptions (cont'd)

11-23  

Vacuum Hose Routing (cont'd)

  1. 4WAY
  2. VSS
  3. ASSEMBLE TO VSV.
  4. MUST INSERT TO THE END.
  5. VSV
  6. ASSEMBLE TO 4WAY.
  7. INSERTION LENGTH IS MORE THAN 10mm.
  8. CLAMP TO HARNESS; P/P
  9. EVRV
  10. VSV
  11. 4WAY
  12. ASSEMBLE TO EVRV.
  13. MUST INSERT TO THE END.
  14. EVR
  15. 3WAY
  16. INSERTION LENGTH IS MORE THAN 10mm
  17. ASSEMBLE TO 3WAY

No. Part Name QTY Remarks
(1) JOINT; 4WAY 1  
(2) HOSE; VACUUM, V/PIPE-4WAY 1 ø7
(3) HOSE; VACUUM, TURBO-EVRV 1 ø10
(4) HOSE; VACUUM, 4WAY-EVRV (TURBO) 1 ø7-ø8 4WAY-EVRV (TURBO)
(5) HOSE; VACUUM, 4WAY-EVRV (EGR) 1 ø7-ø8 4WAY-EVRV (EGR)
(6) HOSE; VACUUM, 4WAY-VSV 1 ø7-ø8 4WAY-VSV
(9) JOINT; 3WAY 1  
(10) HOSE; VACUUM, TURBO-3WAY 1 ø10
(11) HOSE; VACUUM, EGR-3WAY 1 ø10
(12) HOSE; VACUUM, 3WAY-A/C 1 ø10

aaa