Multiplex Integrated Control System Function Test - Power Tailgate (5D)
Multiplex Integrated Control System Function Test - Power Tailgate
| 1. | Connect the Honda PGM Tester or the HDS to the data link connector (DLC). |
| 2. | Select the FUNCTION TEST MENU.
|
| 1. | Connect the Honda PGM Tester or the HDS to the data link connector (DLC). |
| 2. | Select the FUNCTION TEST MENU.
|