M/T Change Lever Assembly Disassembly/Reassembly (M/T)
M/T Change Lever Assembly Disassembly/Reassembly
Prior to reassembling, clean all the parts in solvent, dry them, and apply lubricant to any contact surface.
5-speed model:
Turn toward the front
of the vehicle, and install it.DUST SEAL
Replace.CHANGE LEVER COVERROLLER6 x 1.0 mm
12 N·m
(1.2 kgf·m, 9 lbf·ft)SELECT LEVER
Be careful not to damage the dust seal
when installing it.DUST COVER1ST/2ND SELECT
SPRING5TH SELECT
SPRINGOIL SEAL
Replace.SELECT STOP
PLATEINTERLOCKREVERSE LOCK CAM
STRIKER8 mm SPRING WASHER8 mm SPECIAL BOLT
31 N·m
(3.2 kgf·m, 23 lbf·ft)SHIFT ARMCHANGE LEVER(P/N 41211-PY5-305)SHIFT
ARM
COVERWASHER(P/N 41211-PY5-305)(P/N 41211-PY5-305)
NOTE: If 5 minutes have passed after applying liquid gasket, reapply it and assemble the shift arm cover.
6-speed model:
Replace.SHIFT
ARM
COVERSELECT STOP
PLATESHIFT ARM6 x 1.0 mm
12 N·m
(1.2 kgf·m, 9 lbf·ft)ROLLERDUST SEAL
Replace.SELECT LEVER
Be careful not to damage the dust seal
when installing it.BREATHER CAP
Turn toward the front
of the vehicle, and install it.8 mm
SPRING WASHER8 mm SPECIAL BOLT
31 N·m
(3.2 kgf·m, 23 lbf·ft)INTERLOCK1ST/2ND
SELECT
SPRING5TH/6TH
SELECT
SPRINGWASHERSHIFT
ROCK
CAM AREVERSE LOCKOUT
SOLENOID
Apply liquid gasket
(P/N 08C70-K0234M) to
the sealing surface.MBS RETURN
SPRINGMBS ARMCHANGE
LEVER COVER(P/N 41211-PY5-305)(P/N 41211-PY5-305)(P/N 41211-PY5-305)CHANGE LEVER