DTC Troubleshooting: 93-01
Check for continuity between body ground and the LKAS control unit 26P connector No. 8, No. 21 terminals individually.
Is there continuity?
YES
-
Repair short to body ground in the wire between EPS control unit and LKAS control unit.■
NO
-
Go to
Step 13
.